LogoDispatch
2,847appointments scheduled today
99.2%on-time starts
37 minavg. changeover

Your shop floor,
finally in sync.

Drag-and-drop scheduling precision down to the machine hour. No whiteboards. No shouted confirmations. No 6 AM photo texts.

Live · Shift 1 of 2 · 14 machines · Saturday, May 30
06:00
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
VMC-01
VMC-02
VMC-03
VMC-04
LATHE-01
LATHE-02
LATHE-03
CNC-01
CNC-02
CNC-03
STAMP-01
STAMP-02
GRIND-01
GRIND-02
RUN
SETUP
MNT
QUEUE
SHIFT 1 · May 30, 2026
2,847 appointments scheduled today·99.2% on-time starts·37 min avg. changeover·Zero whiteboard lag·Works on any HMI terminal·ISO 22400 downtime codes·SAP · Epicor · JobBOSS native connectors·
2,847 appointments scheduled today·99.2% on-time starts·37 min avg. changeover·Zero whiteboard lag·Works on any HMI terminal·ISO 22400 downtime codes·SAP · Epicor · JobBOSS native connectors·
73%
reduction in scheduling conflicts — avg. across 140 job shops

The board is always green.
Even at 5:45 AM.

Dispatch replaces the magnetic strip board with a live scheduling engine that knows every machine's current job, next job, tooling state, and operator. Changeover buffers auto-calculate. Conflicts surface before the shift starts — not during it.

  • Drag a job block to reschedule — conflict check fires in <200ms
  • Changeover time templates per machine family
  • Supervisors get a push notification, not a phone call
  • Full audit trail: who moved what, when, and why
Feature
Dispatch
Whiteboard
Spreadsheet
Legacy MES
Drag-and-drop job assignment
Real-time conflict detection
Multi-shift visibility (single screen)
Changeover buffer automation
Live OEE feed per job
Schedule version history
Works offline on the floor
89.4%
average OEE achieved by Dispatch customers after 90 days

Every spindle accounted for.
Every minute of capacity visible.

Dispatch connects directly to your CNC controllers via MTConnect and FOCAS. Cycle times stream live. When a Mazak runs 12% over estimate, the supervisor sees it on the board — not during the shift debrief.

500+
Machines supported
MTConnect, FOCAS, OPC-UA
CNC protocols
< 8 min
Setup time per machine
30 sec
Heatmap refresh rate
Feature
Dispatch
Whiteboard
Spreadsheet
Legacy MES
Per-machine utilization heatmap
Maintenance window blocking
Tooling & fixture tracking
Cycle time vs. estimated alert
Machine group / cell scheduling
Downtime reason codes (ISO 22400)
41 min
saved per supervisor per shift on assignment coordination

Right operator.
Right machine. Right now.

Dispatch holds your operator skill matrix. When you drag a job to a machine, it surfaces the three best-qualified operators on shift — sorted by certification, availability, and overtime hours. No more "who can run the Haas?"

Production Supervisor
Stops walking the floor to find an available operator
Plant Manager
Shift handover documented automatically — no calls
Operations Director
Cross-shift utilization visible from any browser
Feature
Dispatch
Whiteboard
Spreadsheet
Legacy MES
Operator skill-matrix matching
Shift handover notes (in-app)
Overtime & absence flagging
Cross-shift visibility
Push alerts for assignment changes
Role-based view (supervisor / mgr)
1-click
connection to your existing ERP — no middleware, no consultants

Slots into your stack.
Without ripping anything out.

Dispatch ships with native connectors for every major ERP, MES, and CNC controller platform. OAuth handshake, field mapping wizard, live sync — done in under 20 minutes. Your SAP job orders land in Dispatch automatically. No CSV exports. No double entry.

🏭Connect
SAP
ERP
⚙️Connect
Epicor
ERP
🔩Connect
JobBOSS
Job Shop
📊Connect
Infor
ERP
🖥️Connect
Plex
MES
🌷Connect
Tulip
MES
🛠️Connect
Shoptech
Job Shop
🐟Connect
Fishbowl
Inventory
🔧Connect
Mazak MTConnect
CNC
🔄Connect
Haas NGC
CNC
Connect
Fanuc FOCAS
CNC
📋Connect
Google Sheets
Escape hatch

Don't see your stack? Dispatch exposes a REST + webhook API that connects to any system that speaks JSON. Most custom integrations ship in under 2 days.

$2.4M
average annual capacity recovered — 24-machine shop, 2 shifts

Run the numbers.
Then show your plant manager.

Enter your floor's numbers. Watch utilization climb. The math is conservative — based on anonymized data from 140 Dispatch customers over 18 months.

Your Floor
Machines14machines
280
Shifts per day2shifts
13
Avg job length4hrs
112
Projected with Dispatch
Machine Utilization
0%vs ~58% baseline
Machine-Hours Recovered / Week
0hrs
Scheduling Conflicts Avoided / Week
0conflicts
No form. No sales call required. No credit card.

Your floor is ready.
Is your schedule?

Dispatch onboards in under 20 minutes. Connect your ERP, import your machine list, and your first shift is scheduled.

Scan on your floor
App Store
Google Play
Free to install
Dispatch